Foxford School and Community Arts Centre

Foxford School and Community Arts Centre

Due to the high-demand for sixth-form places at Foxford School and Community Arts Centre in the Longford area of Coventry, four new teaching spaces were required to accommodate an additional 120 students and six new staff members.

Hugg Homes, Cheshunt

Hugg Homes, Cheshunt

Thurston was commissioned to design, manufacture and install units to a bespoke specification, from pre-designed layouts for 32 two bed homes.

Aldi, Neston

Aldi, Neston

Thurston Group contract with Aldi included designing, manufacturing, and installing a single bay gatehouse at its site at Neston.

Aldi, Atherston

Aldi, Atherston

The contract included the design, manufacture, and installation of a single bay Gatehouse comprising a Control Room, Lobby, Plant Room, Disabled WC, Driver’s WC, Beverage Area, and Cleaners’ Store.

Tameside General Hospital

Tameside General Hospital

Thurston Group were presented with a different type of challenge with Tameside and Glossop Integrated Care NHS Foundation Trust.

Bio-Cube 1, Edinburgh

Bio-Cube 1, Edinburgh

Working with Faithful & Gould, the client’s agent, Thurston Group delivered Bio-Cube 1, Edinburgh. A prestigious 12,000 sq ft premium quality laboratory and office accommodation building over two floors.

West Middlesex Hospital

West Middlesex Hospital

Thurston Group manufactured a bespoke ten bay modular Urgent Care Unit, including groundworks, as part of a turnkey package for West Middlesex Hospital.

Walton Leigh School

Walton Leigh School

Working with Surrey Council, Thurston Group has delivered a modular Pupil Enrichment Centre for Walton Leigh School. A non-residential special school for children with severe disabilities.

Tang Hall Primary School

Tang Hall Primary School

Thurston Group has worked with the City of York Council on a bespoke modular children’s centre for Tang Hall Primary School.

Wythenshawe Hospital

Wythenshawe Hospital

Presented with a different type of challenge, Thurston Group delivered a staged project providing three specialist modular ward facilities for Wythenshawe Hospital.

Hugg Homes, Southampton

Hugg Homes, Southampton

Thurston Group was commissioned to design, manufacture and install one, two and three bed bespoke modular homes for Hugg Homes, Southampton.

Askham Bryan College

Askham Bryan College

Thurston Group has delivered three robust, low maintenance and economic to run three storey modular buildings for Askham Bryan College.